Friday, March 16, 2012

The Flying Plank RR moves along

Having made some progress on the train set its time to put up some new pics.  I have replaced the mess of switches at the control yard with a pair of Kato Unitrack double crossovers.  I had to replace the 12v controller, so I went with the Kato speed control that hooks up to the switch controls for the double crossovers. 

train-set-march-4train-set-march-10train-set-march-7At one point I also suffered a total failure of my little switcher engine so the obvious choice was the dirt cheap Bachmann GP50 wearing a Union Pacific dress.

train-set-march-9train-set-march-3train-set-march-8train-set-march-6train-set-march-2

I am particularly proud of the arch supported bridge. That arch is made from 3 strips of 1/16th balsa bent around the rim of a 5 gallon bucket and glued. The concrete (grey 2x4’s) foundations will eventually be surrounded by the scenery

train-set-march-1train-set-march-5

No comments:

Post a Comment